棋牌游戏平台送10元-免费送体验金网站平台-注册送28元无需申请

Contact us

Contact: Mr. Chen
Mobile: 18013288855
Person in charge of inspection: Manager Shen 18013288860
Tel: 0512-55380866

棋牌游戏平台送10元-免费送体验金网站平台-注册送28元无需申请Address: No. 1666 Jinsha River Road, Kunshan City

Branch: Weiliu Road, Dongtai Development Zone, Yancheng City, Jiangsu Province

Branch 2: No. 88-10, huayuangang Road, Tongzhou District, Nantong City, Jiangsu Province

棋牌游戏平台送10元-免费送体验金网站平台-注册送28元无需申请Branch 3: Dabaco Villa, No. 40 Wuqiang Street, Wuqiang She, Beining City, Vietnam

Branch 4: (Room 3512, Building B, Centralcon Holdings) No. 9 Wen xin san Road, Nanshan District, Shenzhen City, Guangdong Province.

E-mail: cmdang888@163.com
Zip code: 215300

Company news

Suzhou hydropower installation company deep peak equipment of professional staff said: 1, waterway design First of all, in order to good all the water-related equipment, such as: water purifiers, water heaters, kitchen treasure, toilet and wash basin, the

Author: ComeFrom: Date:2016-12-10 13:44:54 Hits:9614

Suzhou hydropower installation company deep peak equipment of professional staff said:
1, waterway design First of all, in order to good all the water-related equipment, such as: water purifiers, water heaters, kitchen treasure, toilet and wash basin, their location, installation and the need for hot water;
2, in advance to make good use of gas or electric water heater, to avoid the temporary replacement of water heater types, resulting in duplication of waterways;
3, the bathroom in addition to the wash basin, toilet, washing machine and other water outlet, the best one then out, then take the water mopping and so very convenient;
4, the washing machine position is determined, the washing machine drainage can be done to the wall inside the drain, beautiful and convenient;
5, after the waterway transformation should have two suppression tests, but now a lot of decoration teams are doing a crackdown;
6, to suppress the best test the presence of property, can play a supervisory role; because some of the decoration team will deceive the owners in this part. The method is: to suppress the time to open the pump to suppress the "back valve" to form a loop, pressure pump looks at work, but the tube and not much pressure, especially for electric pump, students should pay attention. In this case,
7, when the house should pay attention to check the kitchen, bathroom drain is smooth, if the drainage should be timely to make the property clear; renovation should be on the drain during the protection, especially in the kitchen and toilet tiles during the most likely to cause cement Fall into the drain to cause blockage;
8, shop kitchen floor tiles should be put into the water after the check to see if the drain drain is smooth (to remove the drain drain cover after the speed of whichever, because most of the deep water seal drain there are slow drainage problems).


The above is the water and electricity installation company's staff to introduce the note when changing water and electricity, Kunshan City Development Zone deep peak equipment, hydropower installation Co., Ltd. is a professional installation of water and electricity companies, to undertake the installation of electrical and mechanical engineering, hydropower installation, high and low voltage power Installation, cooling towers, ice water units, air compressors, industrial stainless steel pipes, industrial water pumps, ducts, Muxian Cao, high and low voltage distribution cabinet installed in one of the professional installation company and clean room central air conditioning planning and construction.

Next:Nothing
×